Worksheet endpoints
GET /api/delivery, POST /api/delivery/assign, and POST /api/delivery/complete.
This screen shows every truck on a GTA map. Click a truck to see the driver, cargo, destination, delivered vs pending stops, feasibility score, and the gap between actual driving and the AI plan.
Truck markers spread across the GTA network with click-to-inspect details.
Click a truck to inspect driver, cargo, destination, feasibility, and route variance.
Quick route summary, without repeating the ERP-level operational detail.
GET /api/delivery, POST /api/delivery/assign, and POST /api/delivery/complete.
Trucks below the feasibility floor should be split, re-sequenced, or backed up before dispatch.
Total route delta across the current fleet is +144 km versus AI planning.
Current delivery assignments in the shadow layer.
sheet-001
Temperature verification required before dock departure.
sheet-002
Signature capture required at delivery completion.
sheet-003
Signature capture required at delivery completion.
sheet-004
Temperature verification required before dock departure.
sheet-005
Signature capture required at delivery completion.
sheet-006
Signature capture required at delivery completion.
sheet-007
Temperature verification required before dock departure.
sheet-008
Signature capture required at delivery completion.
sheet-009
Signature capture required at delivery completion.
sheet-010
Temperature verification required before dock departure.